supply boat arrival and first offload
The supply boat rounds the headland on a rising tide, engine note deep and steady. Kevin stands at the seaward cleat with the come-along ready. Jenny keys the radio from the cottage porch, guiding the captain to the landing zone. The crane block hangs plumb from the north piling. First crate off the ramp will be the Yanmar engine crate, then medical.
Kevin and Jenny offloaded the engine crate and medical crate from the supply boat using the come-along, staging both on timbers by the cottage path. The third plank on the dock held under the load but showed new flex. The radio crate remains aboard the boat.
(into handheld VHF) "Sorrel Island to supply vessel. You're clear to the ramp. Engine crate first, then medical, then radio. Come-along's rigged on the seaward cleat. Crane block on the north piling. Two-hour window on this tide."
grip the come-along handle, feet braced on the cleat timber, eyes on the boat's bow as it lines up for the ramp
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Copy that, Kevin. Radio parts go in the medical crate - that's what the manifest says. Engine crate first, then all three crates together.
Walk down the dock planks toward the seaward cleat, checking the rotting planks underfoot while keeping pace with Kevin's movements.
💭 peek at the thought
poolside/laguna-xs-2.1
Third plank. Stay on the stringer.
feed slack on the come-along as the boat's ramp touches dock, hook ready for the engine crate's lift ring
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
I've got it. Just get the hook set.
Step carefully onto the main stringer and stand clear of the lift radius, leaning on the drift cane to keep my weight off the infected ankle.
💭 peek at the thought
google/gemma-4-31b-it
(quiet, to Jenny) Clear astern.
snap the come-along hook into the engine crate's lift ring, take up tension slow, check the load path before hauling
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
(low) Load looks balanced. Pull it.
Watch the tension on the line, eyes scanning the boat's deck for the red-taped medical crate.
💭 peek at the thought
google/gemma-4-31b-it
(grunted) Coming up.
haul the come-along hand over hand, engine crate rising clear of the ramp, swing it inboard toward the staging area by the cottage path
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Easy on the swing. Don't let it catch the piling.
Move a few steps along the stringer to guide the crate's path, keeping the drift cane steady between the dock and the boat.
💭 peek at the thought
google/gemma-4-31b-it
Set.
lower the engine crate onto the staging timbers, chock the corners with oak wedges, unhook the come-along, feed the line back toward the boat's ramp for the next lift
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Medical next. Get the hook on the red tape.
Step back toward the landing zone, eyes fixed on the captain to signal the next crate's position.
💭 peek at the thought
google/gemma-4-31b-it
Hooked. Coming up.
engage the come-along ratchet, haul the medical crate clear of the ramp, swing it inboard to the staging area beside the engine crate
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Good. Leave it right there.
Move toward the medical crate as it touches the timbers, reaching out to touch the red tape to confirm it's the right one.
💭 peek at the thought
google/gemma-4-31b-it
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.