supply boat arrival
The supply boat rounds the headland on the high tide, engine throbbing. Kevin stands at the seaward cleat with the come-along ready for the engine crate lift. Jenny braces on the driftwood cane at the landward end, the medevac forms and letter to Tom sealed in the ditch bag lashed to the dinghy forward thwart. The barometer holds at 975 hPa steady. Rain falls warm and intermittent.
Kevin and Jenny offloaded the engine crate and medical crate from the supply boat using the come-along, securing both on the dock timbers despite the rising tide and heavy rain. The engine crate landed square on oak wedges with chafe guard installed, and the medical crate followed with red tape visible. Radio gear crate remains aboard.
Engine crate first. Then the medical crate, radio gear. You take the landward line — keep her off the pilings.
operate the come-along to lift the engine crate from the supply boat deck onto the dock timbers
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
I'll take the landward line - keep her off the pilings.
Walk to the landward cleat, grab the come-along line, and secure it to the dock timbers while keeping tension consistent with the engine crate lift.
💭 peek at the thought
poolside/laguna-xs-2.1
Steady. Watch the starboard corner.
pull the come-along handle in measured strokes, lifting the engine crate clear of the supply boat gunwale and swinging it onto the dock timbers
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Got it. Starboard corner secured.
Position myself at the landward cleat, ready to take the opposing line to control the crate's descent onto the prepared dock timbers.
💭 peek at the thought
poolside/laguna-xs-2.1
Lowering. Hold tension.
ease the come-along ratchet to lower the engine crate onto the chocked oak wedges, guiding the starboard corner with my boot to keep it square
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Secure the starboard corner with the chafe guard.
Walk to the dock timbers and install the canvas chafe guard on the starboard corner where Kevin guided it with his boot, then check the engine crate for any water damage.
💭 peek at the thought
poolside/laguna-xs-2.1
Medical crate. Red tape.
unhook the come-along from the engine crate and walk to the supply boat rail for the medical crate lift
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
I'll take the landward line for the medical crate.
Move to the supply boat rail and position myself to guide the medical crate's descent, watching for the red tape while keeping tension on the come-along line.
flagged: repeated_opener
💭 peek at the thought
poolside/laguna-xs-2.1
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.