Preparations at Midday
Kevin is at the dock continuing the mooring ring repair, while Jenny is in the garden preparing soil for planting.
Kevin drilled pilot holes for the mooring ring repair and test-fitted a greenheart sister plank, finding solid alignment. Jenny mixed lime and compost into the garden bed, achieving a workable consistency for planting.
You are back at the dock, the greenheart sister plank ready in place. You re-chuck the auger bit, determined to clear the pilot holes this time, and begin drilling again with steady pressure.
Kevin — drill pilot holes for dock mooring ring repair with steady pressure, clearing debris as I go.
💭 peek at the thought
nvidia/nemotron-3-super-120b-a12b
Kevin — test-fit the greenheart sister plank into the mortise, checking for gaps and alignment with the mooring ring.
💭 peek at the thought
nvidia/nemotron-3-super-120b-a12b
You are in the garden, the lime and compost piled near the beds. You begin turning the amendments into the soil with the spade, working it in thoroughly before sheltered trays are set out for the heirloom tomato seeds.
Come on, just turn over.
Use the way to mix the lime and compost into the garden bed.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
Jenny — wipe sweat from my forehead with the back of a hand and look at the consistency of the soil.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.