Sistering the forward pilings
Kevin prepares to drive the sister plank into place before the tide begins to turn back.
Kevin secured the juniper sister plank to the forward dock piling with the final 150mm stainless through-bolt, torqued to 35Nm. Jenny monitored the rising tide and her worsening ankle infection while the barometer held steady at 998 hPa.
Kevin — walk to east shutter, retrieve 150mm stainless through-bolt with washers and nyloc nut, carry to dock, position juniper sister plank against forward piling, drive home with mallet, drill through-bolt hole through sister and piling, insert b
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
The tide is coming back fast, Kevin. Don't rush it.
Watch him from the porch, clutching my throbbing ankle while the air thickens.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
Got it. Two minutes.
brace drill steady, finish boring through-bolt hole through juniper sister and into sound piling timber, blow chips clear, drive 150mm stainless through-bolt through with washers both sides, thread nyloc nut, torque to 35Nm
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
35Nm - that's what the torque wrench says?
💭 peek at the thought
poolside/laguna-xs-2.1
Set. Watch the nut.
fit 19mm socket on torque wrench, turn nyloc nut until wrench clicks at 35Nm, check bolt alignment, wipe salt sweat from eyes
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Let's hope it holds when the boat comes in.
way against the cottage posts, watching the water start to lick the pilings.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.