Low Tide Inspection
Kevin and Jenny meet at the dock as the tide reaches its lowest point, checking the mooring lines.
Kevin and Jenny assessed the dock's rot damage and debated epoxy use for the cleat mortise versus saving it for the mooring ring bolts. Kevin proposed bridging the rot with greenheart plates and through-bolts, epoxying only bolt holes, but Jenny noted this would leave no 150mm bolts for the stern spring attachment tomorrow. They agreed to thin epoxy with diesel for scarf faces and use full strength on the mortise.
Watch the tension on the way line. The wood is too soft to hold much.
way shifts her weight to her good leg, wincing as her throbbing ankle pulses, and reaches out to touch the decaying timber of the dock.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
Sistered the cleat base with greenheart last week. Through-bolted. It's the planking between the bolts that'll go." I nod at the rotten planks. "Got three sound cores salvaged. Need the tide lower to fit them.
crouch and probe the seaward plank with the crowbar tip, testing the rot depth
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
We'll need to use the epoxy on the joints. The humidity is going to make the cure time hell.
wipes a bead of sweat from her brow and looks down at the wood, gritting her teeth against the sharp throb in her ankle.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
Got half a tub left. Mixed the last of the hardener yesterday. If we thin it with diesel it'll penetrate deeper but cure slower." I glance at her ankle, then the planks. "Or we drive the sisters tight, peg them with oak, and save the epoxy for the cleat mortise.
stand and wipe hands on trousers, looking toward the cottage
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
The wedges could hold through high tide, but I need the epoxy to seal the joint against salt intrusion.
shifts her weight onto her cane and peers down at the seaward planks, noting the dark discoloration where moisture has worked through the wood.
💭 peek at the thought
poolside/laguna-xs-2.1
"Thin it for the scarf faces. Full strength for the mortise." I pull the epoxy tub from my belt. "Half a cup. Enough for both if we're careful.
unscrew the tub lid and hold it out, watching the resin cling thick and amber to the stir stick
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
"Half a cup won't fill a single mortise. The cleat's sitting in a cavity from decades of rot." (I grip the epoxy tub tighter, feeling the weight of it in my palm)
sets the tub on a dry plank and checks my supplies, counting the remaining greenheart offcuts and measuring the depth of the mortise with my fingers.
💭 peek at the thought
poolside/laguna-xs-2.1
"Don't fill it. Bridge it." I pick up the tub. "Two greenheart plates, one each side of the stringer. Four 150mm through-bolts. Epoxy the bolt holes only. Cleat bolts to the plates, not the rotted timber.
screw the lid back on the epoxy tub and hook it to my belt
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
That leaves us with no bolts for the stern spring line attachment tomorrow. The mooring ring needs those 150s for the through-plate.
reaches into my pocket and pulls out the north ridge soil pH map, tracing the red wax marks with my fingertip before tucking it back.
💭 peek at the thought
poolside/laguna-xs-2.1
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.