Day 324
Shim Held, Tide Rising
On Day 324, thick fog clung to the water as Kevin and Jenny inspected the dock piling near the mooring ring, finding the wood soft and crumbling past the bolt holes — a serious structural failure. Jenny confirmed enough greenheart timber in the shed to sister the damaged section. They planned to cut the greenheart before the next high tide surge. At midday, Kevin rowed to the north piling and found the greenheart shim stable with no movement; Jenny sketched sea beet morphology on the porch before watching the horizon. In the afternoon, Kevin monitored the north piling shims while Jenny continued botanical observations on the north cliffs in warm rain. By evening, the rain slowed to a drizzle as the tide turned. Kevin headed to the dock to check the mooring ring and spring lines, ensuring the dinghy was secure against the growing swell. Jenny waited on the cottage porch, watching the barometer drop. They ate boiled limpets for dinner. Kevin reported the shim held with no movement, saying it would hold until the supply boat arrived in ten days, after which they would sister the whole piling. Jenny warned him to be careful as the barometer dropped. Kevin checked in via radio on 2182 before returning. Jenny urged him back from the edge as the water rose. He came in shivering, and they agreed to check the moorings before lighting the fire.
On Day 324, thick fog clung to the water as Kevin and Jenny inspected the dock piling near the mooring ring, finding the wood soft and crumbling past the bolt holes — a serious structural failure. Jenny confirmed enough greenheart timber in the shed to sister the damaged section. They planned to cut the greenheart before the next high tide surge. At midday, Kevin rowed to the north piling and found the greenheart shim stable with no movement; Jenny sketched sea beet morphology on the porch before watching the horizon. In the afternoon, Kevin monitored the north piling shims while Jenny continued botanical observations on the north cliffs in warm rain. By evening, the rain slowed to a drizzle as the tide turned. Kevin headed to the dock to check the mooring ring and spring lines, ensuring the dinghy was secure against the growing swell. Jenny waited on the cottage porch, watching the barometer drop. They ate boiled limpets for dinner. Kevin reported the shim held with no movement, saying it would hold until the supply boat arrived in ten days, after which they would sister the whole piling. Jenny warned him to be careful as the barometer dropped. Kevin checked in via radio on 2182 before returning. Jenny urged him back from the edge as the water rose. He came in shivering, and they agreed to check the moorings before lighting the fire.
Scenes
the dock · dawnThe Morning Ebb
Thick fog clings to the water, obscuring the lighthouse as the tide retreats. Kevin and Jenny stand on the damp planks, watching the water line recede, revealing the lower pilings.
Kevin and Jenny inspected the dock piling to assess the extent of the rot near the mooring ring. Kevin found the wood was soft and crumbling past the bolt holes, indicating a serious structural failure, while Jenny checked the garden shed and found enough greenheart timber to sister the damaged section.
Shim first. Mooring ring after. Tide won't wait.
walk to the north piling, crouch at water's edge, pull the LED headlamp from my belt and shine it up under the dock structure to inspect the greenheart shim driven under the piling toe
💭 thought
The wood is holding for now, but the grain is turning soft like mush underneath.
Kneel on the wet timber, reach out a gloved hand, and lightly tap the piling to listen for hollow.
💭 thought
Mm. Shim's tight. Mortise behind the ring's the weak link. Wedges split yesterday — oak's no good in wet rot. Gotta sister the seaward face before next spring tide.
move to the mooring ring, brace one knee on the dock, test the ring with both hands — heave up, shove down, feel for play in the mortise
💭 thought
We'll need the heavy-duty epoxy and those 150mm bolts I saved; it's more than a simple patch.
Pull the notebook from my pocket and sketch the rot pattern in the wood where the ring meets the main beam.
💭 thought
Epoxy's gone. Bolts are in. Mortise core's the problem — if it's crumbled past the bolt holes, no glue holds. Need to cut the rot out, scarf new greenheart, through-bolt the lot. Or we lose the ring next surge.
pull the nail puller from my belt, dig into the mortise wood around the ring base to test how deep the rot goes — feel for solid timber
💭 thought
If it's deeper than the bolts, I'll have to sister the whole face of the piling to take the load.
Reach in with the tip of my way knife and scrape the center of the mortise to see how much it gives.
💭 thought
Knife goes in to the hilt. Rot's past the bolts. Whole seaward face needs sistering. Greenheart offcuts in the shed — need to measure, see if we can scarf a full-length piece.
stand, wipe hands on thighs, head for the garden shed to check greenheart stock
💭 thought
Grab the tape measure; we need to know exactly how much surface we have.
Follow him into the shed, notebook tucked under my arm, and scan the piles of timber.
💭 thought
the garden · morningPreparing for the repair
The fog thickens as you meet at the shed, the barometer dropping further as you discuss how the greenheart must be cut before the next high tide surge.
No narrator was available, so nothing about this stretch was recorded.
"We need to cut the greenheart today. If the tide rises, we can't get the shim." ownDO: Measure the gap in the way with the tape measure and mark the greenheart with a pencil.
💭 thought
Got the tape in my pocket. You hold the stick steady?
Measure the gap beneath the north piling toe with the tape measure, call out the depth, then mark the greenheart offcut with pencil for the tapered shim cut.
💭 thought
"Hold it level. It needs to be a perfect fit or the pressure shifts." ownDO: Hold the greenheart board against the rotting post while he marks the line.
💭 thought
Got it. Level as I can make it.
Hold the greenheart board vertically against the rotting north piling, flush with the toe, so Jenny can sight along the edge and mark the cut line where it meets the sound wood above the rot.
💭 thought
"Good. We'll need to taper it down just right once the tide is out." ownDO: Step back to inspect the pencil mark, then wipe grit from my palms.
💭 thought
Mark's set. We cut on the low tide window — starts in forty minutes. You take the saw, I'll clear the debris.
Step back to confirm the pencil line on the greenheart, then wipe my palms on my trousers to clear salt and grit before handling tools.
💭 thought
I'll get the saw. Make sure the path to the dock is clear of kelp.
Walk to the shed to retrieve the handsaw.
💭 thought
On it.
Walk the dock planks from cottage to piling, kicking loose kelp and wet weed overboard, checking each board for give underfoot.
💭 thought
the keeper's cottage · middayA Quiet Stretch
Back at the cottage.
Kevin rowed to the north piling to inspect the greenheart shim, while Jenny sketched sea beet morphology on the porch before moving to watch the horizon. Kevin found the shim stable with no further movement, and Jenny completed detailed leaf edge sketches. Both returned to the cottage as clouds darkened and the barometer held steady.
Jenny, I’m going to take the dinghy out to the north piling — check the shim, see if the tide’s moved it any more. Want anything from the pools while I’m there?
walk to the dinghy, untie the stern line, push off from the dock, ship the oars, and row toward the north piling at low tide.
💭 thought
Bring back some limpets if you see good ones. And be careful with the boat, the current is pulling north.
Pick up the notebook and pencil, starting the sketch of the sea beet morphology.
💭 thought
Aye. I’ll hug the lee of the east reef till I’m abreast, then cut across. Won’t be long.
row the dinghy using a sculling motion with the starboard oar to maintain position against the north current, aiming for the lee of the east reef to avoid being swept downstream, then angle toward the north piling once clear of the stronges
💭 thought
Watch the barometer, it was dropping faster than usual.
Sharpen the pencil and focus on the serration of the sea beet leaf edges.
💭 thought
Noted. If it hits 1020 I’m back regardless.
reach the north piling, secure the dinghy painter to the rusted cleat with a round turn and two half hitches, step onto the kelp-slick stone, and inspect the greenheart shim driven under the toe at low tide — checking for movement, compress
💭 thought
Don't stay out too long, the clouds are turning the color of a bruised plum.
Stand up and walk to the porch to watch the horizon.
💭 thought
the dock · afternoonAfternoon Work Apart
Kevin is at the dock inspecting the mooring ring, Jenny is on the north cliffs continuing her botanical observations.
The warm rain continues through the afternoon as the tide goes out. Kevin monitors the north piling shims for movement while Jenny works on documenting the morphology of the sea beetets in the damp air.
Kevin — reach for the cedar wedges and mallet from the dock box, insert two wedges into the mortise on either side of the ring, then stand on the dinghy’s gunwale and bounce lightly to test lateral shift.
💭 thought
Hang on, little thing.
make a sketch: North Cliff Succulent Morphology.
💭 thought
Kevin — pull the wedges, pocket them, and walk back toward the cottage along the jetty, checking the two rotten planks I haven't replaced yet.
💭 thought
Jenny — close the notebook and walk back toward the dock.
💭 thought
Kevin — step onto the shore, head up the path toward the cottage, mallet hooking my belt, the wedges heavy in my pocket.
💭 thought
Jenny — descend the cliff path toward the cottage.
💭 thought
the dock · eveningEvening Tide Turn
The rain has slowed to a drizzle as the tide begins to turn. You and Jenny meet to prepare the evening meal using the boiled limpets.
The rain continues its steady, rhythmic drumming against the tin roof as Kevin heads for the dock. The tide has retreated, exposing the slick, algae-covered rocks of the north flank, while Jenny prepares to stay inside, the dinghy bobbing slightly against its moorings as the water begins its slow return.
The limpets are ready. Pass the salt, will?
Take the bowl of limpets from the stove and set them on the wooden table.
💭 thought
"Here." (I slide the chipped salt cellar toward her, my knuckles brushing the rim of the bowl.)
I pull out the second chair and sit, waiting for her to serve before I take my first bite.
💭 thought
Eat before they get cold. You've worked long enough today.
Scoop a few limpets onto his plate and slide it toward him.
💭 thought
"Shim held. No movement on the north piling since the last tide." (I take the plate, fork a limpet, chew slow.)
I eat, watching her face in the lantern light—seeing if she's eating too, or just watching me.
💭 thought
Good. The sister is deep enough to handle the swell for now.
Take a limpet for myself, the salt hitting sharp on my tongue.
💭 thought
(I don't look up, fork limpets into my mouth.) "It'll hold till the boat. Ten days." (I swallow, voice low.) "Then we sister the whole piling."
I push the empty bowl aside, wipe my hands on my trousers, and stand. "I'll take the dinghy out on the flood. Check the north face for drift—see what the tide's brought in." (I don't wait for an answer, already moving toward the door.)
💭 thought
Be careful. The barometer is dropping.
Watch him go through the door, then turn back to the empty bowl.
💭 thought
(Pausing at the doorframe, half-turned.) "Radio on 2182. I'll check in at the hour."
I pull the oilskin from the hook, shrug into it, and step out into the drizzle—down the path to the dock, hands already finding the dinghy's gunwales by feel.
💭 thought
I'll watch the water.
Pick up the notebook from the table and flip to the damp page of sea beet sketches.
💭 thought
(Into the handheld VHF, squelch cracking.) "Sorrel Island. North piling shim holding. Scour increased. No new drift. Returning."
I kill the engine, ship the oars, and pull for the dock—slow, letting the tide help, listening to the water suck at the pilings.
💭 thought
the dock · nightThe rising tide meets the storm
The water is now reaching the lower pilings of the dock, and the wind is picking up.
The tide is rising quickly, pushing the water high against the dock's pilings. Kevin checks the mooring ring and spring lines to ensure the dinghy is secure against the growing swell. Jenny waits on the cottage porch, watching the barometer drop as she prepares for a potential shift in the weather.
Kevin, get back from the edge! The water is rising!
Walk to the doorway and watch the tide lap against the pilings.
💭 thought
Coming in.
row back to the dock, tie off the dinghy, and walk up to the cottage porch
💭 thought
You're shivering. We need to check the moorings before the wind catches it.
Step onto the porch and hand him a towel.
💭 thought
Thanks. Moorings first, then fire.
take the towel, rub my hands and face dry, then walk down to the dock to check the mooring ring and spring lines
💭 thought
What changed
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.