Rot, Tide, and a Falling Barometer
Dawn found Kevin on the sistered beam probing the south piling with a spike. The rot had advanced past his tape mark by a knuckle, punk wood crumbling into the rising water. Jenny sat on a crate wrapping her ankle, notebook open, recording salt-crust patterns on the timber and noting the tide line higher than yesterday. "The tide is high early," she said. "If the boat doesn't come tomorrow, we'll have to move the wayhy higher." Kevin disagreed: the garden wall wouldn't take the weight; they'd shift stores to the cottage loft.
Dawn found Kevin on the sistered beam probing the south piling with a spike. The rot had advanced past his tape mark by a knuckle, punk wood crumbling into the rising water. Jenny sat on a crate wrapping her ankle, notebook open, recording salt-crust patterns on the timber and noting the tide line higher than yesterday. "The tide is high early," she said. "If the boat doesn't come tomorrow, we'll have to move the wayhy higher." Kevin disagreed: the garden wall wouldn't take the weight; they'd shift stores to the cottage loft.
At high tide they marked and cut the twisted greenheart offcut for a diagonal brace, pre-drilling bolt holes in the longer pieces. A jellyfish bloom drifted pale and slow through the bay. Midday split them: Kevin stayed at the dock sawing greenheart, hands tacky with sap, watching the water suck away from the pilings; Jenny climbed to the north ridge to finish the soil survey, sketching the clay lens at forty centimetres and the latest slump cross-section. The barometer read 1011 hPa and falling.
Evening low tide exposed the full rot extent. North shims held. East piling showed half-inch surface rot at brace level, bolts sound. West needed mud cleared at tomorrow's spring low — 0640, two hours before the supply boat's 1000 ETA. The mooring ring's doubler plate bolts were secure in sound timber landward, but the piling core was punk inside the bolt line on the water side, rot within fifty millimetres of the mortise.
Rain hammered the roof after dark. At the table by lantern light Kevin sketched a spreader plate on graph paper, verified the shortwave aerial seal and coax continuity. Jenny debrided her ankle with saline, applied a fresh sea beet poultice, sketched sea beet leaf morphology and salt gland density. The barometer read 1009 hPa. The generator ran. The shortwave was silent. "Boat comes or it doesn't," Kevin said. "Either way, the ring gets a spreader plate tomorrow. First light."
Scenes
the dock · dawnPre-Tide Inspection
Kevin sits on the sistered beam, checking the progress of the rot on the south piling. Jenny sits on a crate nearby, wrapping her ankle in a fresh poultice while watching the tide come in.
Kevin inspects the south dock pilings as the tide rises, checking the extent of the rot. Jenny documents the salt-crust patterns on the timber, noting how high the water is reaching compared to yesterday.
The tide is high early. If the boat doesn't come tomorrow, we'll have to move the wayhy higher.
Sketch the salt-crust patterns on the timber in the notebook.
💭 thought
Boat's due on the flood. If she misses, we shift stores to the cottage loft before the ebb. Not the wayhy — too much weight for the garden wall.
Tap the yellow tape marker on the south piling with a knuckle, then lean over the gunwale to sight the rot line against the sister brace.
💭 thought
The wall won't hold if the ground saturates again. We need a stable patch on the ridge first.
Tighten the bandage on the ankle and check if the swelling has increased.
💭 thought
Ridge first. Intercept trench above the spring line, same as last time. But the ankle decides the pace.
Pull the notebook from my back pocket, flip to the north ridge sketches, and hold it out to her without a word.
💭 thought
The soil up there is holding. If I can find the right drainage, grandmother's seeds actually stand a chance.
Take the notebook and mark the specific erosion points on the north ridge map.
💭 thought
The trench buys time. Doesn't fix the clay lens at forty centimetres. You hit water there, it runs sideways into the garden footings.
Crouch beside the crate, watching her pen move across the page — the same ridges I walked with the auger, the same iron bands at forty and one-twenty.
💭 thought
I'll debride the slope deeper. If the water runs sideways, I'll divert it to the sea-cliff.
Draw a cross-section of the north ridge soil profile in the notebook, showing the clay layer.
💭 thought
You don't dig the saddle. I do. You mark the line, I cut it. Ankle stays elevated.
Reach for the auger leaning against the dock shed, test the bit — still cleared from the last trench — then set it back down.
💭 thought
the dock · morningHigh Tide Inspection
You and Jenny meet at the dock as the tide reaches its peak. The water is now lapping at the lower planks.
Kevin and Jenny marked and cut the twisted greenheart offcut for a diagonal brace, pre-drilling bolt holes in the longer pieces. A jellyfish bloom drifted into the bay during the work.
South piling's worse. Rot's past the tape by a knuckle.
Crouch at the waterline, probe the timber with the nail puller, marking the new rot boundary with chalk.
💭 thought
The salt is eating it faster than the wood can. We need to sister those beams before the next big swell.
Trace the surface of the wood, feeling for the softness beneath the salt.
💭 thought
Greenheart's stacked by the winch. Two full-length pieces, one partial. Grain's straight on the longs.
Stand, wipe chalk dust on trousers. Walk to the greenheart stack, test the weight of the longer offcut, check end grain for checking.
💭 thought
Good. We'll need the longest for the main supports.
Run a hand over the rough surface of the greenheart, noting the density.
💭 thought
Pre-drill everything. 12mm auger, then 10mm bolt clearance. Don't force the bit.
Haul the longest greenheart offcut to the south piling, brace it against the dock stringer to check length and fit.
💭 thought
Good call. I'll mark the bolt pattern now." "I'm checking the grain orientation on the partial—it's got a slight twist that could compromise the joint.
Take the 12mm auger from the tool chest and set it against the greenheart beam, marking the bolt locations with a sharp pencil. </think>THOUGHT: He trusts the pre-drill plan but I need to verify the alignment while the tide's still high and
💭 thought
Partial's twist is in the upper third. Heel section's clean. Could work for the diagonal brace if we cut above the twist.
Mark the bolt pattern on the long greenheart piece with pencil, measuring from the sound timber on the piling, accounting for the 150mm through-bolt spacing.
💭 thought
I'll mark the cut line now. We need to be sure the twist is clear of the joint.
Trace the cut line across the greenheart beam with the pencil, ensuring it stays well above the compromised section.
💭 thought
Cut it. I'll set up the bow saw on the bench.
Walk to the workbench, clear sawdust off the bow saw blade, apply a drop of oil to the tension screw, test the blade tension with a thumb.
💭 thought
I'll handle the marking. Just make sure the bench is stable.
Pick up the greenheart offcut and carry it to the workbench, feeling the weight of the wood.
💭 thought
the dock · middayMidday work split
Kevin is at the dock struggling with the greenheart sawing; Jenny is on the hilltop completing the north ridge soil survey.
The tide is receding rapidly, exposing the slick, dark rocks of the southern shelf near the dock. Kevin stands on the pier, his hands still tacky with greenheart sap, watching the water pull away from the pilings. Jenny sits on the porch steps, her ankle wrapped in a cooling poultice as she checks the barometer, the slow drop in pressure suggesting a shift in the weather.
Kevin — finish the diagonal cut on the greenheart offcut with the bow saw, then carry the piece to the south piling and drill the bolt holes in the main beams with the 12mm auger
💭 thought
Not yet. Just one more day.
Sketch the cross-section of the latest slump in the notebook.
💭 thought
Kevin — carry the greenheart brace to the south piling, clamp it in position against the sistered plank and main beam, and drill the first 12mm bolt hole through both timbers
💭 thought
Jenny — stand up slowly, leaning on the cane, and walk back toward the cottage.
💭 thought
Kevin — drill the second bolt hole through the brace and main beam, then move to the sistered plank and drill the third and fourth holes
💭 thought
Jenny — reach into my pack and pull out the flashlight, flicking it on.
💭 thought
the dock · afternoonPreparations for the Supply Boat
The sun begins to dip as the tide reaches its lowest point, increasing tension for tomorrow's arrival.
Kevin and Jenny spent the afternoon at the dock assessing the structural integrity of the pilings before the supply boat's arrival. They identified the extent of the rot in the south section while the tide exposed the wood.
The tide is out far enough. Look at the rot on that south piling.
make sketch: rot patterns on the southings.
💭 thought
Past the brace. Into the clean wood.
walk to south end of dock, crouch at piling base, probe rot line with screwdriver blade, measure exposed sound timber above sister brace with finger span
💭 thought
It's cleaner than I thought. We need to check the other three before the tide comes back.
record the depth of the decay in the garden log.
💭 thought
North first. Shim line held last check. East took the beating. West won't show till we dig.
walk north along dock, test each piling with screwdriver at waterline and brace height, kick planks for hollow sound, call out findings to Jenny
💭 thought
Check the shims carefully. I'll debride this own while the light holds.
stand up and walk toward the cottage for the saline kit.
💭 thought
North shims holding. No new crush. East piling — rot at brace level, half-inch deep. West — can't reach the mudline yet.
crouch at north piling, probe shim gaps with blade, tap each shim with hammer handle listening for movement, move to east piling and probe rot at brace, mark depth with chalk, walk to west end and assess mudline exposure
💭 thought
Keep an eye on those east shims. If they shift, we need to reinforce the base.
sit on the porch steps and prepare the saline soak for the ankle.
💭 thought
East is sistered, not shimmed. Bolts sound. Rot's surface only — half inch, clean. West piling needs the mud cleared at low water tomorrow.
tap east sister bolts with wrench checking for movement, chalk-mark rot limits on east face, walk back toward cottage, glance at Jenny's ankle from dock end
💭 thought
I'll get the shovel ready for the mud. We need to see what the tide is hiding.
unwrap the bandage and soak the ankle in the salt water.
💭 thought
Shovel's in the shed. Spring low 0640 tomorrow. Two hours to dig west and sister if needed. Supply boat ETA high tide — 1000 if the forecast holds.
walk back up dock to shore, climb porch steps, set down screwdriver and chalk on table, pour coffee from kettle into tin mug, sit on porch edge facing dock
💭 thought
the old shrine · eveningPreparing for the Boat
Kevin and Jenny meet at the dock as the sun begins to set. They organize the gear needed for the boat's arrival tomorrow morning.
Kevin and Jenny checked the dock mooring ring bolts and found them holding, though the piling remains punk inside. They returned to the cottage as the barometer fell to 1011 hPa, with the supply boat arrival uncertain.
Check the radio one last time before we head in; I need to know if the signal was clear.
Sketch the rot pattern on the third own in the notebook.
💭 thought
Radio's on the table. I'll run the check now.
walk to the cottage porch, pick up the shortwave handset, key the mic on 2182, and call "Sorrel Island to supply vessel, radio check, over"
💭 thought
The barometer is dropping too fast for a clear morning, Kevin.
Watch the needle on the gauge.
💭 thought
Then we secure what we can tonight. Crane pads, mooring ring, the sister brace tell-tales. If they can't lift, we hand-carry.
set the handset back in its cradle, walk to the dock with Jenny, and start checking the mooring ring bolts by feel and wrench
💭 thought
Focus on the ring first. If that goes, the whole dock comes with it.
Trace the line of the rot with a pencil.
💭 thought
Doubler plate's on the landward side. Bolts go through sound wood. I'll check torque on all four.
fit the 19mm wrench onto the first through-bolt nut, lean into it, and feel for any give — then move to the second, third, and fourth
💭 thought
It's holding for now. If the tide gets higher, we'll see.
Press a thumb against the wood near the fitting to check for softness.
💭 thought
Water side's the weak link. Piling's sound at the bolt line but punk inside. Need a spreader or a knee before the lift.
pull the last 10mm x 150mm stainless through-bolt with washers and nyloc from my pocket, hold it up against the piling to gauge length, then tuck it back — mental measure for a spreader plate tomorrow if the boat shows
💭 thought
We'll get inside. If the boat doesn't come, we'll have to rethink Plan B.
Walk slowly back to the cottage, favoring the left leg.
💭 thought
Boat comes or it doesn't. Either way, the ring gets a spreader plate tomorrow. First light.
follow her up the path, slow to match her pace, one hand hovering near her elbow in case the ground shifts — the other hand brushing the spruce spar propped against the porch rail, still tacky with epoxy at the crack
💭 thought
the keeper's cottage · nightNight watch and spreader plate layout
Rain hammers the cottage roof. Kevin and Jenny sit at the table by lantern light, the last stainless through-bolt between them. Kevin sketches a spreader plate on graph paper; Jenny logs the barometer at 1009 hPa. The generator runs. The shortwave is silent. The supply boat is due at high tide tomorrow — if it comes.
Kevin verified the shortwave radio's aerial seal and coax continuity, then sketched a spreader plate design for the south piling repair. Jenny debrided her ankle wound with saline, applied a fresh sea beet poultice, and sketched sea beet leaf morphology in her notebook while the barometer continued falling.
Check the radio one more time before you sleep, Kevin.
Wrap the ankle in a dry cloth and sketch the salt patterns on the sea beet leaves.
💭 thought
Already did. 2182, 4125, 6215. Nothing but atmospherics. French freighter was the last real contact, two days out. If the captain's smart, he's hove to.
make sketch: spreader plate for south piling — 10mm stainless through-bolt, 150mm, with 3mm steel doubler plate, four bolt pattern, greenheart sister plank backing
💭 thought
Then we hope he's smarter than the tide is taking the dock.
Move the heirloom seed tin to the dry shelf and check the level for moisture.
💭 thought
Tide doesn't care about smart. Just physics and rot.
check the shortwave radio aerial connection one last time, verify the self-amalgamating tape seal on the insulator is holding
💭 thought
way make sure the radio works tomorrow.
Apply the saline wash to the ankle and debride the edge.
💭 thought
Aerial's sealed. Coax continuity tested good. Ground stake's solid. If the radio fails tomorrow, it won't be the wire.
pour the last of the coffee into two tin mugs, set one beside her notes
💭 thought
I hope you're right about the wire.
Trace the morphology of the sea beet leaves in the notebook.
💭 thought
What changed