Day 923
Supply Boat at High Tide
Dawn found Kevin and Jenny at the dock's edge, the onshore breeze light, humidity high. Jenny shifted weight off her wrapped ankle while Kevin checked the dinghy mooring lines. "Lines are holding. Dinghy's riding easy," he said. She replied, "The dock planks are still soft. Don't lean too hard on the edge." He stayed off the soft section as he inspected the north pilings and newly sistered planks ahead of the supply boat. Jenny remained near the cottage, organizing seed tins and managing her ankle pain.
Dawn found Kevin and Jenny at the dock's edge, the onshore breeze light, humidity high. Jenny shifted weight off her wrapped ankle while Kevin checked the dinghy mooring lines. "Lines are holding. Dinghy's riding easy," he said. She replied, "The dock planks are still soft. Don't lean too hard on the edge." He stayed off the soft section as he inspected the north pilings and newly sistered planks ahead of the supply boat. Jenny remained near the cottage, organizing seed tins and managing her ankle pain.
The boat's engine drone echoed across the bay as the tide began to fall. Kevin moved to the seaward end to secure bow lines, checking the sistered planks. Jenny clutched the manifest by the winch. "Boat's here. Two-hour window. You stay on the radio log and manifest. I'll handle the crane and heavy gear," Kevin said. "I have the manifest ready. way don't forget the pH strips and the salt," she answered. "pH strips and salt are on the list. Go sit on the crate by the winch. I'll bring the loads to you."
The crane swung the first pallet — diesel drums, a crate marked 'Yanmar impeller,' a heavy mail sack. Kevin monitored the seaward plank and stringer sister joint as the second drum lowered. "Steady on the winch. Let the tide do the work," he said. Jenny hobbled to the landward bolt with her cane. "It's holding. For now. Watch the second one close." The drum settled without shock load; the sister joint held.
At high tide, the barometer read 1026 hPa, steady, no wind. The second drum was chocked on the seaward planks. Kevin leaned on the crane rail; Jenny sat on the crate lid, cane across her knees, the ridge map folded in her pouch. The supply boat was due again tomorrow at high tide. The dinghy rode its doubled lines, stern spring singing faintly as the tide retreated, exposing slick, rotting pilings. Kevin finished securing the sister joint, though the rot within the beam felt more structural than surface damage suggested. Jenny watched from the shadows, her ankle throbbing in sync with the lapping waves.
Scenes
the dock · dawnThe Calm Before Arrival
Kevin and Jenny stand at the edge of the dock, watching the horizon under the light onshore breeze. Jenny shifts her weight off her wrapped ankle while Kevin checks the tension on the dinghy mooring lines.
Kevin spends the morning inspecting the structural integrity of the dock and north pilings ahead of the supply boat arrival. Jenny stays near the cottage, managing her ankle pain and organizing the seed tins while the humidity remains high.
Lines are holding. Dinghy's riding easy.
check the bow spring tension with one hand, the other resting on the worn gunwale
💭 thought
The dock planks are still soft. Don't lean too hard on the edge.
Lean against the cottage post, wincing as the throb hits my ankle.
💭 thought
Noted. I'll stay off the soft section.
step back onto the sound timber, boots finding the sistered joist beneath
💭 thought
I need to check the pH on the ridge before the sun gets too high.
Wipe sweat from my brow with the back of a hand, staring at the water.
💭 thought
Take the cane. And the radio.
unclip the handheld VHF from my belt and hold it out to her
💭 thought
I'm fine. I just need to get the sketches done.
Take the radio with trembling fingers, the plastic cold against my palm.
💭 thought
the dock · morningSupply Boat Arrival
The engine drone of the supply boat echoes across the bay. You meet Jenny at the dock to begin offloading the cargo.
The supply boat arrives as the tide begins to fall, its hull cutting through the heavy, grey air. Kevin moves to the seaward end to secure the bow lines, checking the integrity of the newly sistered dock planks. Jenny stays by the winch, clutching the manifest and shifting her weight to ease the throbbing in her Jenny's swollen ankle.
Boat's here. Two-hour window. You stay on the radio log and manifest. I'll handle the crane and heavy gear.
walk to the seaward end of the dock to meet the supply boat's bow line, checking the sister joints one last time as I go
💭 thought
I have the manifest ready. way don't forget the pH strips and the salt.
lean heavily on the good leg, shifting weight off the throbbing ankle while I open the notebook to the manifest page.
💭 thought
pH strips and salt are on the list. Go sit on the crate by the winch. I'll bring the loads to you.
catch the heaving line the deckhand throws, secure it to the reinforced mooring ring, then signal the crane operator for the first sling — diesel drums
💭 thought
I'll be here. Watch the balance on those drums, they look heavy.
lower myself slowly onto the wooden crate, wincing through gritted teeth as the pressure hits my swollen ankle.
💭 thought
Clear the deck. Drums coming over.
step back from the dock edge, arms up to guide the first diesel drum as the crane swings it outboard, watching the dock planks for deflection under the load
💭 thought
Watch the pilings, Kevin! The wood is soft.
grip the edge of the crate, knuckles white, as I breathe through the throbbing in my leg.
💭 thought
Rigger's swinging to the ring, not the piles. Planks are sistered. Hold the radio log.
keep one eye on the north piling joint as the first drum settles onto the dock timbers, the other on the crane hook for the second drum, ready to wave off if the deflection exceeds five millimetres
💭 thought
It's holding. For now. Watch the second one close.
note the weight in the log, my hand shaking slightly as I watch the dock dip under the iron.
💭 thought
the dock · middayOffloading the supply
The two-hour window is narrow as the first of the heavy crates and drums are swung toward the shore.
Kevin and Jenny stand at the dock as the tide begins its slow turn, the humid air hanging heavy over the salt-crusted wood. They are testing the integrity of the newly sistered planks under the weight of a heavy supply crate, knowing that the supply boat is due tomorrow at high tide and the dock must be sound to handle the arrival.
Steady on the winch. Let the tide do the work.
walk to the seaward end of the dock, position myself at the newly sistered planks to monitor the first crane load
💭 thought
Watch the tension on that line, Kevin. The wood is slicker than it looks.
lean on my good leg, squinting at the joint where the crate meets the timber.
💭 thought
Got it. Ease her in, don't snub.
grab the bow line at the seaward cleat, feed it slow to take the crate's weight as the crane lowers, eyes on the sister joint for any flex
💭 thought
Slow. It's groaning already.
place a hand flat against the main piling, feeling for vibration under the weight.
💭 thought
Crane! Hold! Let it hang!
step to the crane tag line, haul it tight to arrest the swing, then signal the operator to lower slow and vertical
💭 thought
(shouting over the rigging) "Brace the stern! If it pivots—"
grab the spare anchor warp and run it through the bow chock, securing it tight as insurance.
💭 thought
the dock · afternoonPreparing for the Tide
The tide is starting to rise, giving them a few hours of dry light to finalize the area for the supply boat's arrival.
Kevin reinforced the second cleat with a greenheart sister plank and 150mm stainless through-bolt torqued to 26Nm, then rigged bow and stern spring lines with fenders deployed. Jenny attempted soil pH testing and sea beet transplanting but was hindered by rising tide and ankle pain, managing only a partial shrine sketch before weather worsened.
Stringer bolts are tight. Cleat sistering held last surge. Going to walk the seaward piling one more time before they round the point.
walk to the seaward end of the dock, testing each plank underfoot, checking the north piling shims and the oak wedges in the mooring ring mortise
💭 thought
Watch the rot on the second cleat, it still feels soft.
Jenny leans back against the cottage wall, wincing as her ankle shifts, and opens her notebook to sketch the morphology of a sea beet leaf she found earlier.
💭 thought
Marked it. Will sister before they hook the first pallet.
crouch at the second cleat, probe the rot line with the screwdriver, then pull the greenheart offcut and 150mm through-bolt from the staging pile
💭 thought
Just don't over-torque it, the salt has already made the fibers like glass.
Jenny stops her pencil mid-stroke, staring at the thickening clouds on the horizon, and rubs the damp skin over her ankle.
💭 thought
Won't. Quarter turn back from torque spec. Feel for the wood.
drill the pilot hole through the greenheart sister into sound timber behind the rot, drive the 150mm stainless through-bolt with washers and nyloc nut, torque to 26Nm instead of 35, test the cleat with body weight
💭 thought
way. The tide is turning too fast for us to be mistakes when the boat hits.
Jenny closes her notebook with a soft thud, stands up slowly with a grimace, and walks toward the end of the jetty to check the artworkhy lines.
💭 thought
Spring lines next. Then the crane hook.
walk to the bow cleat, double the heavy weather line around the north piling base, serve the chafe point with sail twine, check the stern spring tension
💭 thought
Keep them tight. The current will pull harder than it looks.
Jenny reaches the end of the dinghy, watching the water lap against the wood, and feels the weight of the hunger in her stomach.
💭 thought
Bow line led fair. Stern spring doubled. Crane swing clear?
check the crane swing arc from the dock edge, verify no shrouds or mast bracket in the radius, pull the manifest from the oilskin pouch at the winch
💭 thought
Clear. But watch the swell, it's picking up.
Jenny leans over the side of the artworkhy, checking the rotten planks of the jetty, and watches the horizon for any sign of the hull.
💭 thought
Fenders. Bow and stern. Warp slack two feet.
deploy the rubber fenders on the seaward gunwales, pay out two feet of slack on the bow and stern warps, scan the horizon for the supply boat's hull
💭 thought
Got it. We need to be ready if the wind keeps pushing.
Jenny grips the rough timber of the dinghy, her fingers tracing the grain, and watches the flat sky turn a bruised purple.
💭 thought
the dock · eveningsupply boat arrival
The supply boat rounds the point at high tide, engine throttling down as it approaches the dock. Kevin stands at the bow cleat with the manifest, Jenny at the landward end braced on her cane. The crane boom swings out over the water. First pallet touches the planks — diesel drums, a crate marked 'Yanmar impeller', and a mail sack heavy with official envelopes.
Kevin monitored the seaward dock plank and stringer sister joint while the crane lowered the second diesel drum, signaling the operator to ease it slowly. Jenny hobbled to the landward bolt with her cane, confirming no fresh movement at the joint, and marked the flex point on her sketch. The drum settled without shock load; the sister joint held.
Kevin, check that seaward plank where the first drum settled—my compass test showed movement.
move toward diesel drums, test plank stability with cane, retrieve pH strips and notebook from dock bag, sketch plank deflection in margin of existing ridge map
💭 thought
On it. You take the manifest, I'll watch the plank.
walk to seaward end of dock, crouch beside third plank from crane side, press palm flat to timber where drum sits, watch for flex under load, tap with hammer handle to listen for hollow rot
💭 thought
If it shifts more than an inch, don't let them drop the crate yet.
lean weight on cane, watch the timber for lateral movement, pull pH strips from pocket, dejected note the swelling in the journal.
💭 thought
Holding. No shift yet. But we've got two more drums and the crate. Stringer sister's the weak link — if that walks, the plank goes with it.
stay crouched, eyes on the stringer sister joint where greenheart meets old timber, watch bolt heads for rotation, tap plank again with hammer handle listening for change in note
💭 thought
way them to set the next drum slow. We need to see how the way takes the load.
shift weight to my good leg, watch the wayer sister for new cracks, wipe sweat from my throbbing ankle.
💭 thought
Radio. Tell them slow lower on the second drum. No shock load.
stay crouched at seaward end, one hand on the stringer sister joint feeling for vibration, other hand raised to signal crane operator — palm down, slow motion — while watching the bolt heads and the scarf line for any fresh opening
💭 thought
way they to ease the drum up and forward a bit, I'll check the wayer bolt.
shift to the landward end, grab the manifest from the crate, mark the flex point on my sketch with a red line, then hobble toward the joint with my cane as a probe.
💭 thought
Ease it up. Forward slow. Jenny's checking the landward bolt.
raise arm to crane operator — fist clenched, then slow forward sweep — keep eyes on the seaward scarf line and bolt heads, ready to call stop if the timber breathes wrong
💭 thought
the dock · nightNight watch at the dock
High tide slackens under a flat, cloud-thick sky. The second diesel drum is chocked on the seaward planks. Kevin leans on the crane rail, watching the water. Jenny sits on the crate lid, cane across her knees, the ridge map folded in her pouch. The supply boat is due tomorrow at high tide. The barometer reads 1026 hPa and steady. No wind. The dinghy rides its doubled lines, stern spring singing faintly.
The humidity hangs heavy over the dock as the tide retreats, exposing the slick, rotting wood of the pilings. Kevin finishes the securing work on the sister joint, though the rot within the beam feels more structural than the surface damage suggested. Jenny watches from the shadows, her ankle throbbing in sync with the lapping waves as they wait for the supply boat's arrival tomorrow.
Drum three and the crate on the high. Come-along on the landward cleat. Last long bolt for the crate landing spot.
walk to the landward end of the dock, inspect the cleat sister joint and stage the come-along and final 150mm stainless through-bolt with washers and nyloc nut
💭 thought
Check the cleat again, Kevin. Don't let the drum slip.
Shift weight to the good leg, wincing as the thbbing spikes through the gauze.
💭 thought
Cleat's holding. Greenheart plate, four long bolts, epoxy mortise. Two drums didn't move it. Third won't either.
tap the cleat sister joint with the hammer handle, checking each bolt head for movement, then set the come-along on the landward cleat and run the tail to the north piling base
💭 thought
Just make sure the tension is even. I don't want that crate sliding into the water.
Pull the two remaining pH strips from the kit and look at them in my hand.
💭 thought
Tension'll be even. Come-along's fresh, north piling's solid. Last bolt goes in the seaward sister before the crate swings. You save the strips for the beds.
pull the final 150mm stainless through-bolt, washers, and nyloc nut from the east shutter staging spot and carry it to the seaward sister joint, laying it ready on the dock plank
💭 thought
Tighten it twice. The rot is deeper than the surface looks.
Watch him work the joint, my ankle throbbing in time with the waves.
💭 thought
What changed
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.