supply boat arrival
The supply boat rounds the point at high tide, engine throttling down for the two-hour window. Kevin and Jenny stand on the dock together, the dinghy secured astern, the deadman line still unsecured at the anchor. The captain waves from the wheelhouse. Crates are visible on deck — replacement impeller, antibiotics, radio parts, and the rest of the manifest.
No narrator was available, so nothing about this stretch was recorded.
Captain's got what we need. The impeller's the priority, but we're not going anywhere without checking the deadman line first.
Walk toward the dock's seaward end, cane tapping the planks rhythmically, then climb onto the dock to inspect the compromised deadman line where the splice failed.
💭 peek at the thought
poolside/laguna-xs-2.1
I'll finish the deadman splice. You take the bow line when they make the approach — keep the dinghy clear of the prop.
walk to the deadman anchor at the landward end of the dock, coil the new half-inch three-strand rope from the workbench, and begin the eye splice for the thimble
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
I'm taking the bow line now. Keep those hands steady - I saw your tremor when you checked the impeller yesterday.
Retrieve the new half-inch three-strand rope from the workbench, inspect the chafe guard installation, then walk to the bow where the dinghy's secured and prepare to re-tie the bow line with proper slack for swell movement.
💭 peek at the thought
poolside/laguna-xs-2.1
Bow line's yours. I'll have the deadman fast before they're alongside.
sit on the dock planking at the landward anchor, pull the new rope taut against the thimble, and start the first tuck of the eye splice with deliberate, measured movements
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Barometer's holding at 1012 and rising. That's what we need.
Walk to the bow of the dinghy, uncoil the half-inch three-strand rope, inspect the chafe guard installation, then begin re-tying the bow line with proper slack for swell movement while keeping one eye on Kevin's work at the anchor.
💭 peek at the thought
poolside/laguna-xs-2.1
Kevin — complete the first tuck cleanly, rotate the rope, begin the second tuck following the lay, pull each strand tight against the standing part
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.