Supply boat radio contact and dock triage
Kevin and Jenny meet back at the cottage porch. The handheld VHF crackles with Tom's voice confirming the supply boat for tomorrow's high tide. The barometer holds at 982 hPa. They have until the tide rises to decide: sister plank three now with the staged greenheart and bolts, or wait for the supply boat's extra hands and materials. Jenny's ankle is wrapped fresh; Kevin's hands are raw. The dolphin pod is gone.
Kevin and Jenny sistered the cracked dock plank three with a greenheart plank, packing the through-crack with filed cedar shims before drilling and bolting. The repair held as the tide began to turn, though Kevin's hands shook from vibration fatigue and Jenny's ankle throbbed under the fresh poultice.
Tom came through. Boat tomorrow high tide. Two-hour window. Full resupply.
set the repaired coax and notebook on the porch table, flex raw fingers, watch Jenny's face
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Plank three's crack's widened another millimeter since I marked it. We can get the greenheart sister on before the tide fills the crevice if we move now.
Walk to the dock workbench, grab the pre-cut greenheart plank and staged 150mm through-bolts, then hobble back toward the cottage door where Kevin waits.
💭 peek at the thought
poolside/laguna-xs-2.1
I'll drive the bolts. You mark the holes. Don't put weight on that ankle more than you have to.
pick up the heavy mallet and the 19mm socket from the workbench, follow her down the porch steps toward the dock
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
I need to check the crack depth first—if it's through to the joist, we need shims under the sister before bolting.
Kneel carefully on the cane, probe the crack with my awl to determine depth, then mark the through-bolt locations with chalk before handing Kevin the socket.
💭 peek at the thought
poolside/laguna-xs-2.1
Crack's through to the stringer. Need shims. Epoxy's gone.
kneel beside her, tap the awl handle deeper with the mallet to confirm the void, pull the cedar wedge offcuts from my pocket
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Use the cedar shims—thin them with the file if I have to. Pack the crack tight before we bolt the sister on.
File the cedar wedges thinner with my pocket file, then wedge them into the crack void between plank and stringer while Kevin holds the greenheart sister plank in position.
💭 peek at the thought
poolside/laguna-xs-2.1
Hold it there. Don't let it shift.
brace the greenheart sister plank against the dock frame with shoulder and good hand, feed wedges into the gap as she works them in, sweat dripping into salt burns on knuckles
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Pack them tight—I need about two inches of solid cedar before we drill.
Work the wedges deeper with my awl handle, packing the crack void until it's full, then hand Kevin the drill and step back to rest on my cane.
💭 peek at the thought
poolside/laguna-xs-2.1
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.