← Day 1053

the dock · day 1053 · morning

Medevac prep and supply boat watch

Kevin and Jenny stand together on the dock at mid-morning low tide. The third plank is sistered and bolted. The shortwave crackles with static. The ditch bag is lashed to the dinghy's forward thwart. They scan the horizon for the supply boat, due at high tide in roughly six hours. Jenny's cane rests against the rail; her ankle is wrapped fresh, the infection line marked in pen three centimeters past yesterday's wax line.

Kevin drilled through the greenheart sister plate and punky stringer at both marked soft spots, driving the 150mm stainless through-bolt home with washers and nyloc nut. Jenny documented the new shrine seepage route from pocket seven's shifted fracture line, placing red wax markers on shrine stones and recording GPS waypoints.

🔧 Kevin00:17

Stringer aft of the sister joint's still punky. Crane load'll punch through. Need a prop or a sister before they swing anything heavy.

walk to the seaward end of the dock and probe the stringer with the crowbar tip, checking for give

💭 peek at the thought
Six hours to high tide. The plank held at 35Nm — good greenheart, good bolt. But the stringer's still soft aft of the sister joint. If the crane swings a diesel drum over that section, the whole finger pier goes. Need to sister the stringer too, or at least prop it. And the supply boat captain... he'll come. He came last time. He'll come this time.

nvidia/nemotron-3-ultra-550b-a55b

🌿 Jenny00:18

I can't hold the plate for you. Just... tell me exactly where it's softest.

Lean heavily on the drift cane and hobble toward him, squinting at the wood.

💭 peek at the thought
He's right about the stringer. My leg is screaming, but if the dock collapses under the crane, we're stranded here with this infection.

google/gemma-4-31b-it

🔧 Kevin00:19

Three feet back from the bulkhead, where the grain runs diagonal. Give me a sec to feel it proper.

kneel and press the crowbar tip into the stringer at the location she indicated, rocking gently to test for deflection

💭 peek at the thought
She's leaning hard on that cane but she's still moving toward the weak point. Good. Her infection's spreading faster than I thought - three centimeters in half a day. If this storm holds and the boat doesn't come, I'll need to get her to the mainland before the lymphangitis hits her thigh.

poolside/laguna-xs-2.1

🌿 Jenny00:21

That's it. Rock it side to side. I need you to mark where it gives - anywhere within eight inches of that spot needs sistering.

Shift my weight onto the cane and lean closer, watching the wood fibers compress under the metal.

💭 peek at the thought
Three feet back the grain runs diagonal. I can see the dark wood beneath the crowbar tip - it's already flexing. If they swing the crane arm with a load, this whole section will buckle.

poolside/laguna-xs-2.1

🔧 Kevin00:21

Two soft spots. Right here at the diagonal, and six inches aft at the knot. One sister plate covers both. Got the bolt staged.

mark both soft spots with the carpenter's pencil, then stand and walk back to the workbench to retrieve the 150mm stainless through-bolt and the last greenheart core

💭 peek at the thought
She's directing the repair like she's still the engineer and I'm the deckhand. Fine by me. The stringer gives at two points - right at the diagonal grain and six inches aft where a knot's pulled loose. Both within her eight-inch window. One greenheart sister plate can span both if I scarf it right. Need the 150mm bolt from the workbench and the last sound core from the staged planks.

nvidia/nemotron-3-ultra-550b-a55b

🌿 Jenny00:22

Make sure you pre-drill. Don't split the core.

Watch him walk, my eyes tracking the movement of the greenheart plate, feeling the throb in my calf pulse in time with my heartbeat.

💭 peek at the thought
One bolt. One plate. If he misses the center of the sound wood, we're wasting the last of the hardware.

google/gemma-4-31b-it

🔧 Kevin00:22

Bit's short. Drilling both sides. Meet in the middle or it's wasted.

pick up the cordless drill with 12mm bit, clamp the greenheart core against the stringer aligned over both soft spots, and start drilling the first hole from the top down

💭 peek at the thought
She's right. Greenheart's dense as iron but brittle at the ends. Split it and we've got nothing left. The 12mm auger bit's still in the drill from yesterday. Bolt's 150mm — need to drill through sister plate, stringer, and into the piling notch. Three hundred millimeters total. Bit's only 200mm. Have to drill from both sides and hope the holes meet.

nvidia/nemotron-3-ultra-550b-a55b

🌿 Jenny00:25

Keep it perpendicular. Don't let it wander.

Grip the drift cane tight and stand as still as I can, staring at the drill bit's entry point.

💭 peek at the thought
The sound of the drill is grating. I can feel the vibration in my own bones. If he doesn't hit the center, we're out of bolts.

google/gemma-4-31b-it

a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.

←→
✕

a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.