Sistering the Scarf Joint
Midday at the dock. Tide rising, water lapping at the base of plank three. Kevin has the greenheart core positioned, epoxy mixed thick with sawdust, copper shims ready for the bolt holes. The last 150mm stainless through-bolt with washers and nyloc nut is in hand. Jenny sits on the landward cleat with her notebook, ankle elevated on a driftwood splint, radioing the groundwater data. The supply boat is due tomorrow at high tide.
Kevin failed to properly seat the copper shims and torque the 150mm stainless through-bolt on the scarf joint repair as the rising tide made work difficult. Jenny successfully marked the groundwater migration route with copper wire stakes and recorded GPS waypoints for the pocket eight seepage shift toward the cottage foundation.
Bolt holes are ovaled 2.5mm on the narrow axis. Gap at the scarf toe's two mil. Gonna pack it, shim the bolt, drive it home before the water comes up over the stringer.
mix thickened epoxy with sawdust to peanut-butter consistency, pack the hairline gap at the scarf joint lower edge, seat copper shims in the ovaled bolt holes to center the 150mm stainless through-bolt, position greenheart sister plank, dri
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
The bolt's clearance is 3.2mm—shims need to be 0.85mm total. Cut the copper stock thinner.
fetch copper wire from workshop, strip 0.85mm thickness using file, hand-tighten 150mm through-bolt with washers and nyloc nut while tide rises against the stringer, position greenheart sister plank over scarf joint, pack epoxy-sawdust mixt
💭 peek at the thought
poolside/laguna-xs-2.1
On it. Workbench has the copper strip from the pump housing job.
walk to workshop, retrieve copper shim stock, file two strips to 0.85mm each, return to dock, place shims in bolt holes, position greenheart sister plank over scarf joint, insert 150mm stainless through-bolt with washers and nyloc nut, hand
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Kevin, radio Tom with the updated groundwater migration data—pocket eight seepage shifted another 40cm upslope toward cottage foundation.
operate handheld VHF radio, transmit GPS coordinates of pocket eight fracture line shift, update island notebook with new waypoint marking shrine seepage route, apply fresh sea beet-mint poultice to ankle infection boundary, mark dock plank
💭 peek at the thought
poolside/laguna-xs-2.1
Shortwave's at the cottage. VHF don't carry that far. I'll key 2182 once the sister plank's locked. Bolt first.
seat the copper shims in the ovaled bolt holes, align greenheart sister plank over scarf joint, insert 150mm stainless through-bolt with washers and nyloc nut, hand-tighten, torque to 35Nm with 19mm wrench while tide holds stringer down, ve
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Bolt's torqued to 35Nm—tension's holding. Now I need to mark this groundwater migration for the records.
retrieve copper wire from workshop, drive stake at base of plank three with red wax marker, record GPS waypoint for pocket eight seepage route shift, update island notebook with groundwater-fracture correlation data, apply fresh poultice to
💭 peek at the thought
poolside/laguna-xs-2.1
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.