morning coffee and supply boat prep
Kevin and Jenny sit on the porch with tin mugs of strong coffee. The barometer reads 992 hPa steady. High tide is turning. The supply boat is due tomorrow at high tide with a two-hour window — impeller, antibiotics, and radio parts confirmed aboard. They review the offload plan: crane lifts for the diesel drum and Yanmar crate, hand-carry for the rest. The dock's three compromised planks and the deadman anchor line both need attention before the boat arrives.
No narrator was available, so nothing about this stretch was recorded.
Crane lifts first — diesel drum, Yanmar crate. Then hand-carry. Three planks need sistering before that boom swings anything heavy. Deadman line needs a proper splice, not the jury-rig. Got about six hours of workable tide.
walk down to the dock with coffee mug in hand, set it on the plank, and start inspecting the three chalk-marked south-end planks for sistering points
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
I'll mark the sistering points on planks two and four now - need to get the through-bolts installed before the crane arrives. The deadman line splice can wait until after lunch.
Walk to south dock planks, set machete on plank three, drive copper marking flag at plank two midship, punch pilot hole with heated nail at plank four starboard edge for 150mm through-bolt, check generator fuel line clamp still secure, retu
💭 peek at the thought
poolside/laguna-xs-2.1
Take the 150mm bolts from the workbench. Last three stainless through-bolts with nylocs. Plank three's the worst — rot line runs diagonal across grain. Sister to sound wood on both sides.
pick up the crowbar and heavy mallet from the workbench, walk to plank three, and start prying the rotted section clear to expose sound timber for the scarf joint
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Use the heavy mallet instead of prying - less risk of splitting the sound timber. Drive the sister plates flush first, then bolt.
Retrieve 150mm through-bolts from workbench, test bolt threads in west piling mortise (still tight), carry heavy mallet to plank three, set crowbar aside, drive 10mm steel doubler plate against rotted section with mallet, mark through-bolt
💭 peek at the thought
poolside/laguna-xs-2.1
Got it. Driving sisters flush on plank three first.
set the crowbar down, pick up the heavy mallet, and drive the greenheart sister plates tight against the sound timber on both sides of plank three's diagonal rot line, working from center outward
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Stagger the through-bolt holes - one at 30cm from crack center, second at 45cm offset. Don't want them aligned through both sisters.
Mark staggered through-bolt positions on plank three with pencil, drive first 150mm through-bolt with washer and nyloc nut at 30cm mark, check alignment through sound timber, prepare second bolt with copper shim for any gap at 45cm mark, ve
💭 peek at the thought
poolside/laguna-xs-2.1
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.