Afternoon tasks on dock and garden
Kevin is at the dock shaping a reinforcement for the mooring ring; Jenny is in the garden preparing limpets for lunch.
Kevin spent the afternoon at the dock attempting to reinforce the loose mooring ring which has been shifting under load. Jenny focused on the garden, checking the heirloom seedlings and managing the shade cloth in the heat.
You are fitting the shaped sister knee against the loose mooring ring in the mortise, marking where it contacts the dock timber. You drill pilot holes for the bronze bolts you recovered earlier, preparing to draw the ring tight against the new wood.
Kevin — mark contact line on sister knee and dock timber; drill pilot holes for bronze bolts through sister knee into dock mortise
💭 peek at the thought
nvidia/nemotron-3-super-120b-a12b
Kevin — fit sister knee into mortise against mooring ring; insert bronze bolts through knee and ring; tighten bolts alternately with wrench to draw ring tight against dock timber
💭 peek at the thought
nvidia/nemotron-3-super-120b-a12b
You are rinsing the limpets in seawater to remove grit before boiling them in the cast iron skillet over the wood stove. The limpets are fresh from the tide pools and ready to cook, their shells tightly closed.
Stay there, you little stubborn things.
Scrub the shells under the running water with a brush, then drop them into the skillet with a splash of water.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
Almost there.
Place the lid over the skillet and wait for the shells to pop open.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.