Supply boat arrival and Yanmar impeller install
Dawn breaks grey and still. The barometer reads 990 hPa steady. High tide brings the supply boat into the cove on schedule. Kevin and Jenny stand on the dock with the dinghy secured, the Yanmar impeller housing staged on the workbench, crane block uncycled, and the groundwater route freshly wax-marked from pocket seven to the shrine.
Kevin installed the new Yanmar impeller at high slack water, working around a stripped bolt hole and a missing bolt by using the two good bolts and the verified gasket. Jenny confirmed the supply boat manifest matches the radioed order and marked the groundwater seepage route from pocket seven to the shrine with red wax, though her sketch of the pocket eight planting grid was cut short by the rising tide.
Boat's early. Crane block needs working before they swing the crate. You take the radio, confirm the manifest. I'll free the block.
walk to the crane block on the dock, apply penetrating oil to the sheave pin, cycle the block by hand to work the oil in
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Radio's in the cottage, but I hear the manifest's got the impeller, antibiotics, and radio parts. Crane block won't cycle freely until I grease the sheave pin properly.
Walk back to the cottage, open the kitchen drawer where the shortwave radio lives, check the antenna insulator still holds with the self-amalgamating tape repair Return to dock with radio, climb onto the crane block platform, unscrew the sh
💭 peek at the thought
poolside/laguna-xs-2.1
Grease tin's on the workbench by the housing bolts. Work it slow — pin's been seized since the November storm.
climb onto the crane platform, apply marine grease to the sheave pin, work the block back and forth by hand until it cycles freely
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Got the radio checked and working. Manifest matches - impeller's in the crate, antibiotics are there, radio parts confirmed. Crane block cycles smooth now with the grease.
Make sketch: groundwater seepage route from pocket seven to shrine, overlay with infection boundary on my ankle, add planting grid for grandmother's seeds in pocket eight Walk toward cottage, radio case in hand, already planning where each
💭 peek at the thought
poolside/laguna-xs-2.1
Impeller housing staged. Tap and bolts ready. Twenty minutes to high slack.
retrieve the Yanmar impeller housing from the workbench, carry it to the dinghy, begin removing the housing bolts with the 21mm socket
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Radio's tested and good. I'll mark the planting grid in pocket eight now - high tide's still covering it, but I can see the outline from the dock.
Make map: Pocket eight planting grid with carved bamboo stakes, mark groundwater seepage route continuation from shrine back toward cottage foundation where I noticed dampness this morning Walk toward pocket eight, sketchbook in hand, alrea
💭 peek at the thought
poolside/laguna-xs-2.1
Two bolts holding. One stripped thread, one missing. Gasket's good. Old impeller worn not shredded.
remove the old impeller from the housing, inspect the splines and gasket surface, seat the new impeller with the verified gasket, begin threading the two good bolts by hand
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
I'll mark the remaining bolt holes with the copper wire - three junction stones along the groundwater route, four total for the full circuit to the shrine.
Make diagram: Yanmar housing bolt locations with stripped/missing indicators, overlay with groundwater seepage GPS coordinates from pocket seven Walk back toward shrine route markers, carrying the shortwave radio and fresh red wax block Mak
💭 peek at the thought
poolside/laguna-xs-2.1
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.