Evening at the Shrine
You meet at the ridge as the sun begins to dip, discussing the supply boat's arrival tomorrow.
Kevin and Jenny walked from the shrine back to the cottage, discussing the supply boat's arrival and the north ridge drainage. Kevin retrieved copper sulfate and twine from the workshop and handed them to Jenny. They confirmed the water tank holds 382 litres and agreed to check the medical crate first when the boat lands.
Boat's due on the flood tide. Mendez usually hits the channel by 0900 if the bar holds.
lean the mattock against a greenheart plate and wipe my hands on my thighs
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
I need the copper sulfate and more twine. The garden wall is still losing to the salt.
Jenny shifts her weight to her good leg, winces, and brushes pencil dust off her sketch.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
Got both. Workshop shelf and porch hook. North corner's the worst?
start walking back toward the cottage, pace slow for her leg
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Everything is eroding. I'll check the tank again when we get back.
Jenny closes her notebook with a snap and follows him, limping slightly on the uneven stones.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
It's stable. 382 litres. But we should check after the tide runs out tomorrow.
unlock the workshop door and walk over to the shelf
💭 peek at the thought
poolside/laguna-xs-2.1
I need to map the northern drainage before the next storm hits.
Jenny leans against the cottage wall and pulls the shortwave notebook from her pocket, flipping to a page where she's sketched the soil pockets near the shrine.
💭 peek at the thought
poolside/laguna-xs-2.1
Trench is holding. Three pockets marked on the map — GPS coordinates cross-referenced with the Carex transect. North end still weeping at the fracture line.
pull the copper sulfate bottle from the shelf and set it on the bench, then reach for the twine roll on the hook by the door
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
Then we'll have to debride the wall again tomorrow. The salt is eating through the mortar.
Jenny traces the line of the sketch with a dirty thumb, her brow furrowed as the pain in her ankle spikes.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
Mortar's lime-heavy. We can re-point the worst joints after the boat. Got lime curing on the porch.
hand her the copper sulfate and the twine roll, then pick up the spray bottle from the bench
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
I hope the boat has the antibiotics. I'm down to the last few.
Jenny takes the supplies with a tight nod and looks out at the half-weeded garden.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
Manifest listed broad-spectrum. Penicillin, doxy, metro. Should be in the medical crate.
check the spray bottle nozzle, then set it beside the copper sulfate
💭 peek at the thought
nvidia/nemotron-3-ultra-550b-a55b
We check the crate the first thing when they land.
Jenny shifts her weight, her hand tightening on the roll of twine.
💭 peek at the thought
google/diffusiongemma-26b-a4b-it
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.