Day 29
Dolphins, Dock Planks, and Falling Glass
Dawn broke grey over Sorrel Island. Kevin stood at the water's edge with a crowbar as the tide lapped the dock pilings. A pod of dolphins passed close off the point, fins breaking the surface near the reef. Jenny tried to sketch them but the overcast light and their movement defeated her; she managed only rough pencil outlines. Kevin pried the first rotten dock plank free in one piece and set it on the gravel before the rising tide could reach it. At breakfast they ate boiled limpets with coffee. Medevac authorization forms lay on the table. The barometer read 1001 hPa and falling. "The pressure is falling. We need to get the packets on the stove before it pours, and I'll check the tank levels after I finish these," Jenny said. Kevin replied, "Packets'll hold. Masthead first — coax won't wait for weather. Then lime-cement with accelerator before the wall drinks it all. You check the tank after."
Dawn broke grey over Sorrel Island. Kevin stood at the water's edge with a crowbar as the tide lapped the dock pilings. A pod of dolphins passed close off the point, fins breaking the surface near the reef. Jenny tried to sketch them but the overcast light and their movement defeated her; she managed only rough pencil outlines. Kevin pried the first rotten dock plank free in one piece and set it on the gravel before the rising tide could reach it. At breakfast they ate boiled limpets with coffee. Medevac authorization forms lay on the table. The barometer read 1001 hPa and falling. "The pressure is falling. We need to get the packets on the stove before it pours, and I'll check the tank levels after I finish these," Jenny said. Kevin replied, "Packets'll hold. Masthead first — coax won't wait for weather. Then lime-cement with accelerator before the wall drinks it all. You check the tank after."
Kevin climbed the mast to replace the coax but fumbled the connection, leaving the new cable loosely secured. He climbed to the hilltop to inspect the radio aerial; steady rain made the ascent slick. Jenny sketched tide pool succulents at the pools, completing detailed pencil outlines of Crassulaceae — waxy blue-green rosettes in the upper band, reddish trailing stems lower down — before the rising tide forced her back. Rain slowed to drizzle by afternoon. Kevin tried the dock plank again but wet wood made fibers stubborn. A wooden crate from some lost container ship rolled in the surf near the beach. The rain tank gained about 25 litres. Dock plank replacement reached 50%; radio mast coax replacement reached 50%. Evening found them eating boiled limpets again. "Limpets are ready. Coffee's on," Kevin said. "Tide's turning early," Kevin said. "What for?" "Coast guard said the supply boat's diverted. No ETA. These are if one of us needs off this rock before the next boat." "We have enough food, Kevin." "Not about food." "Are you sick?" "Eat while they're hot. The wind's backing west." The barometer kept dropping. Clouds thickened. Kevin said they'd mix the wall base course tomorrow if humidity broke. Accelerator in the lime-cement. It would cure before the next tide.
Scenes
the dock · dawnThe Rising Tide
Kevin stands by the water edge with the crowbar as the tide begins to lap against the dock pilings. A pod of dolphins passes close off the point, their fins breaking the grey surface of the water near the reef.
Kevin pried the first rotten dock plank free in one piece using the crowbar, setting it aside on the gravel before the rising tide could reach it. Jenny attempted to sketch the dolphins but the overcast light and their movement made detailed work difficult, managing only rough pencil outlines.
Watch the rotten planks, Kevin, they're slick today.
Walk to the edge of the jetty and lean against the post, watching the dolphins.
💭 thought
Aye. Two boards nearest the shore. I'll swap them after the tide turns.
pry up the first rotten plank with the crowbar, working from the landward end where the timber's still sound
💭 thought
Don't pry too hard, the wood is probably mush under the surface.
Pull the notebook from my pocket and start sketching the curve of a dolphin's back.
💭 thought
Mm. Feeling for the joists now.
ease the crowbar under the plank's edge, applying slow upward pressure to find where the nails bite into solid joist versus rot
💭 thought
If it snaps, don't let the waybar go into the water.
Focus on the dolphin's dorsal fin, capturing the way it cuts the grey light.
💭 thought
Won't.
keep steady leverage, pulling the plank free in one piece once the nails release, then set it aside on the gravel clear of the rising water
💭 thought
the keeper's cottage · morningBreakfast and plans
Kevin and Jenny sit at the kitchen table in the keeper's cottage, eating boiled limpets with coffee. The medevac authorization forms lie on the table between them. Outside, the tide continues rising against the dock pilings; the barometer reads 1001 hPa and falling. They discuss the day's work: Kevin's coax replacement at the masthead before humidity climbs, lime-cement mixing for the garden wall base course, and Jenny's seed packet drying and water tank check.
Kevin climbed the mast to replace the coax cable but fumbled the connection at the masthead, leaving the new cable loosely secured. Jenny sketched tide pool succulents at the pools, completing detailed pencil outlines before the rising tide forced her back.
The pressure is falling. We need to get the packets on the stove before it pours, and I'll check the tank levels after I finish these.
Jenny wipes salt from her hands, stands, and gathers the damp seed packets from the newspaper to move them closer to the wood stove.
💭 thought
Packets'll hold. Masthead first — coax won't wait for weather. Then lime-cement with accelerator before the wall drinks it all. You check the tank after.
walk to the porch, uncoil the new half-inch three-strand rope from the high shelf, and carry it to the mast base
💭 thought
fine. just keep an eye on the clouds. Don't let the seeds get too damp in the tin.
Jenny places the tin of seeds on the warmest part of the stove mantle, picks up her notebook, and heads toward the tide pools.
💭 thought
Tin's fine there. Stove's warm, not hot. Back before the rain.
walk to the mast base, coil the new rope over one shoulder, and start climbing the rungs toward the masthead
💭 thought
I'll be at the pools if the wind holds.
Jenny sits on a flat rock, opens her notebook, and begins sketching the waxy surface of a Crassulaceae.
💭 thought
(nothing — too high to shout down, and she didn't ask for anything)
reach the masthead, untie the old coax from the insulator, and begin feeding the new cable through the block
💭 thought
the hilltop · middayMidday work and weather closing in
Kevin is at the hilltop checking the radio aerial; Jenny is at the tide pools packing up her sketches.
Kevin climbed to the hilltop to inspect the radio mast, but the steady rain made the ascent slick and difficult. Jenny spent the morning at the tide pools, gathering limpets as the water receded.
Kevin — climb the mast rungs to the masthead with the new half-inch rope and coax cable to secure the splice properly at the cracked insulator
💭 thought
way there, just a little further.
Walk into the way, set the notebook on the table, and check the seed packets for any new mold.
💭 thought
Kevin — secure the coax splice at the masthead with the new half-inch rope, tightening the connection at the cracked insulator before descending
💭 thought
Jenny — walk out to the water tank to check the level again.
💭 thought
the keeper's cottage · afternoonshelter from the rain
The rain slows to a drizzle as you both head back to the cottage to prepare the morning's catch.
Kevin attempts to pry the rotten dock plank with the crowbar but the wet wood makes the fibers stubborn. Jenny spends the low tide documenting succulents in the pools, finding several species despite the light rain.
Let's get these inside before the wind picks up again.
Gather the handful of limpets and sea beet and follow Kevin toward the kitchen.
💭 thought
Limpets are done. Just need heat. Beet goes in the pan last minute.
walk to the cottage porch and set the crowbar down by the door, then step inside to the kitchen
💭 thought
I'll handle the beet. way get the pan over the stove.
Set the damp sea beet leaves on the counter and start the wood stove.
💭 thought
Wood's wet. Be right back.
grab the hatchet from the hook by the stove and step back out to the porch to split kindling from the dry stack inside the doorway
💭 thought
Use the dry stuff under the eaves, don't bother.
Wash the sea beet leaves in cold water and wait for the fire to catch.
💭 thought
the keeper's cottage · eveningEvening meal and rising tide
The tide is coming in, covering the pools as you return inside to eat the boiled limpets.
Kevin attempted to replace the radio coax, but the rising tide and slick conditions made the work impossible. Jenny focused on sketching tide pool succulents as the water began to cover the shelves. A wooden crate washed up in the surf near the beach.
Limpets are ready. Coffee's on.
walk into the kitchen and set the pot of boiled limpets on the table, then pour two mugs of coffee
💭 thought
Thanks.
sit at the table, pick up a fork, and start eating the limpets.
💭 thought
Kevin — sit opposite her and start on my own limpets, chewing slowly
💭 thought
Jenny — chew slowly, looking out the window at the rising tide.
💭 thought
Tide's turning early.
set my fork down, reach into my jacket pocket, and pull out the folded medevac authorization forms, setting them on the table between us
💭 thought
What for?
stop eating and look down at the forms.
💭 thought
Coast guard said the supply boat's diverted. No ETA. These are if one of us needs off this rock before the next boat.
keep my eyes on the forms, not on her face
💭 thought
We have enough food, Kevin.
set the fork down and touch the edge of the paper with a damp finger.
💭 thought
Not about food.
tap the top form with one calloused finger, the nail split down the middle
💭 thought
Are you sick?
pull my hand back from the table and cross my arms over my lap.
💭 thought
the keeper's cottage · nightNIGHT DAY 29
You sit in the kitchen, the smell of boiled limpets filling the air as the wind picks up outside.
Kevin attempts to secure the radio coax while the barometer holds steady, though humidity remains oppressive. Jenny focuses on documenting tide pool life and managing the heirloom seeds as the storm begins to settle in.
Jenny — pick up a limpet from the plate and eat slowly, watching the rain lash against the windowpane.
💭 thought
Eat while they're hot. The wind's backing west.
Sit at the kitchen table, pick up a limpet with the small fork, and begin eating slowly.
💭 thought
The barometer says so. It's coming.
Chew the rubbery limpet and look at the damp seed packets drying on the newspaper near the stove.
💭 thought
Mm. Glass dropping?
Chew the limpet, swallow, reach for another. Wipe fingers on a rag.
💭 thought
Just a bit. The clouds are thickening.
Reach out and touch the edge of the heirloom seed packet, checking for dampness.
💭 thought
We'll get the wall base course mixed tomorrow if the humidity breaks. Accelerator in the lime-cement. It'll cure before the next tide.
Finish the limpets on the plate. Push the empty plate aside. Pick up the notebook from the table and flip it open to the garden wall page.
💭 thought
What changed
a Lumora Build experiment — live experiment: Kevin & Jenny think on free, open models — what they say is their own.